By implementing a combination of engineering solutions with leading technologies, Singapore’s PUB was able to generate the quality and capacity of treated water required for future demands from the CAWW upgrade project. Through close liaison with the PUB, UGL’s engineering team consisting of experts from its Singapore, Malaysian and Australian offices were able to identify problem areas in the existing plant and assist the customer to enhance operational performance. Key successes included: • Greater treatment plant capacity for future requirements able to process up to 476,900 cubic metres per day, almost twice the current demand of only 272,520 cubic metres per day. • Capital and operating cost savings which will reduce the plants carbon footprint with UGL’s engineering process solutions and the use of leading membrane technology. • An upgraded water treatment system that provides quality, reliable drinking water which avoids costly maintenance downtime through UGL’s proven and robust engineering solutions. • An innovative SCADA system design solution made it possible to optimise water treatment plant automation strategies which delivered better process control and vastly improved chemical dosing control. • Designing a fit for purpose system that satisfied the customer’s requirements
Find out more at http://www.ugllimited.com/chestnut-avenue-water-works-upgrade-projecthttp://www.ugllimited.com/chestnut-avenue-water-works-upgrade-project